Equipment of hall 1 for production according to the EN ISO
9001 : 2000 regulations |
19 reactors (in stainless steel
or glass lined) with a total capacity of 50.000 litres,
4 centrifuges (including one in URANUS).
Different equipment used for filtering, grinding and drying
|
| 2 Equipment
of hall 2 for production according to the EN ISO 9001 : 2000 and
GMP regulations |
6 glass lined reactors with a total
capacity of 32.000 L.
2 centrifuges in AISI 316 L
Different equipments for filtering, grinding and drying
|
| 3
Future potential capacities |
The new building has a construction
structure that will permit the equipment of hall 3 and
4 in the coming years.
The company hopes to expand it's operations by a further
60.000 L capacity.
|